Site Work
HG&E Hadley Falls Fish Passage - Holyoke, MA
Holyoke, MA
Contracted to perform various work involved in the upgrades and renovation to an existing fish lift located at the Connecticut River’s Holyoke Dam/Hadley Falls Facility in the City of Holyoke, MA. Scope of Work:Included (a.) Swiss cheese drilling and hoe-ramming of rock ledge for new 750ft2 plunge pool, (b.) line drill 4-inch on-center pattern around new plunge pool, (c.) demolition of existing concrete bulk head ramp, concrete fish diversion wall, and reinforced concrete apron, (d.) excavation, loading, hauling, and off-site disposal of rock ledge and concrete, (e.) drilling, stuffing, and grouting shear dowels, and (f.) clean ledge and concrete surfaces of all loose materials.