Frost Bridge to Campville 115-kV Project Litchfield, CT

Site Work

Frost Bridge to Campville 115-kV Project Litchfield, CT

kV Project Litchfield, CT

Scope of Work

Contracted to perform all drilling and blasting services for installation of new quarter mile long access road and three (overhead wire) construction pads. Project involved blasting over 35,000 cubic yards of open rock to accommodate the installation of such structures.

Allow us to submit the most reasonable bid on your next site, highway, trench, quarry, drilling, pre-splitting, detention pond or residential project.

You can depend on Baystate Blasting, Inc. for all your Drilling & Blasting needs.